Responsibility calls for reliable solutions.
Protect people. Maintain the ability to act. For businesses and critical infrastructure operators, we develop shelter concepts that can scale to their requirements, from compact units to larger modular facilities.
What operators need to settle first.
Wall thickness is not the decisive question — which function has to keep running is.
Define the protection goal
Staff, control room, server operation or storage — each function leads to a different design.
Critical-infrastructure duties
If your operation falls under critical-infrastructure rules, shelter, emergency power and communication belong in the same concept as your other resilience measures.
Location on the site
Area, subsoil, access and distance to production and hazard zones are checked in advance.
No shutdown
Plant production runs in parallel — work on site stays short.
SafeCore: protected space for staff and technology.
SafeCore is our modular system for companies, industry and critical-infrastructure operators: individually designed, produced in the plant and placed on the site or integrated into a new build. When demand grows, further modules are added.
For companies and above all operators of critical infrastructure: protected space for staff, control room and technology — as a module on the site or integrated into a new build.
Configure first Product page- ■ Occupancy sized to shift strength
- ■ Gas-tight blast door with emergency exit
- ■ NBC filter and overpressure ventilation
- ■ Emergency power and drinking water for several days
- ■ Prepared conduits for network and radio
- ■ Extendable via certified coupling points
Process
From clarifying the requirement to handover — every step with a fixed point of contact.
- 01
Clarify the requirement
Functions, people per shift and the availability you need.
- 02
Site review
Area on the site, subsoil, access, crane standing area, existing services.
- 03
Planning
Design, structural work, technical concept and interfaces to your building services.
- 04
Production
Plant production with batch testing, in parallel with ongoing operations.
- 05
Installation & handover
Placement, connection, function test and measurement record.
- 06
Operation & maintenance
Maintenance plan, filter changes, spare parts and a named contact.
Frequently asked
The questions asked most often in this area.
That depends on sector and thresholds. We review with you which requirements affect the shelter — the legal assessment stays with your compliance function.
Let's talk about your project.
Send us the site, your protection goal and the number of people per shift — you get a first assessment back.
Enquire without obligation.
We review site, requirement and permit situation. Every project is treated confidentially — without naming references, if you prefer.